Cost guide · Washington

What does a kitchen remodel cost in Washington? (2026, from a contractor’s real price book)

These three jobs are InstaBid’s own full-remodel scenarios, priced by the engine from our book. They are not a customer’s bid and not John’s quote for your house.

A typical kitchen remodel (same layout) in Washington runs $73,423, overhead and profit included. That’s the typical job in our book (160 sf kitchen, semi-custom, same layout: 20 lf base + 16 lf wall cabinets with soft-close, quartz counters 50 sf, subway backsplash 30 sf, mid appliance package, vented hood, disposal, tear out vinyl floor + new LVP 160 sf, 6 LED cans, 3 GFCI, drywall patching, walls + ceiling painted): $49,557 in materials and $23,866 in labor.

Read that number right. It’s our book’s cost for the job plus 30% for the contractor’s overhead and profit. That’s how a bid gets built: cost first, overhead and profit on top. It isn’t your bid. Your contractor’s real markup, your house and your finishes all move it.

Smaller kitchens with builder-grade cabinets come in lower. Our low job (120 sf kitchen, builder grade, same layout: 16 lf base + 12 lf wall stock cabinets, laminate counters 40 sf, subway backsplash 30 sf, keep appliances, economy hood, tear out vinyl floor + new LVP 120 sf, 4 LED cans, 2 GFCI, drywall patching, walls + ceiling painted) comes to $26,468. Bigger kitchens with custom everything come in higher. Our high job (220 sf kitchen, custom, same layout: 28 lf base + 22 lf wall cabinets, 2 pantry cabinets, 6 lf island, crown, premium hardware, quartzite counters 70 sf, full-height backsplash 45 sf, premium appliances, premium vented hood, disposal, tear out tile floor + new hardwood 220 sf, 8 LED cans, 3 pendants, under-cabinet LED, 4 GFCI, drywall patching, walls + ceiling painted) comes to $202,330. The table below spells out all three, so you can see which one looks like your house.

Every number here comes from the InstaBid estimating engine, run with no contractor’s private prices in it: just the book, itemized, with 30% added for overhead and profit. Labor rates in our book are set by state today, and we priced this page at a Seattle zip code (98101).

Kitchen remodel cost in Washington: low, typical, high

Low Typical High
The job 120 sf kitchen, builder grade, same layout: 16 lf base + 12 lf wall stock cabinets, laminate counters 40 sf, subway backsplash 30 sf, keep appliances, economy hood, tear out vinyl floor + new LVP 120 sf, 4 LED cans, 2 GFCI, drywall patching, walls + ceiling painted 160 sf kitchen, semi-custom, same layout: 20 lf base + 16 lf wall cabinets with soft-close, quartz counters 50 sf, subway backsplash 30 sf, mid appliance package, vented hood, disposal, tear out vinyl floor + new LVP 160 sf, 6 LED cans, 3 GFCI, drywall patching, walls + ceiling painted 220 sf kitchen, custom, same layout: 28 lf base + 22 lf wall cabinets, 2 pantry cabinets, 6 lf island, crown, premium hardware, quartzite counters 70 sf, full-height backsplash 45 sf, premium appliances, premium vented hood, disposal, tear out tile floor + new hardwood 220 sf, 8 LED cans, 3 pendants, under-cabinet LED, 4 GFCI, drywall patching, walls + ceiling painted
Materials $12,815 $49,557 $147,710
Labor $13,653 $23,866 $54,621
Price, overhead and profit included $26,468 $73,423 $202,330

All three are our book’s materials and labor for the job, plus 30% for the contractor’s overhead and profit. Every figure is rounded on its own (dollars to the dollar, unit rates to the cent), so lines won’t always add to the penny.

Includes a $1,105 permit allowance and tear-out of the old kitchen and floor. Your city’s permit fee will differ.

What moves the number

  • Cabinets. The biggest line on every kitchen. Our book carries cabinets per linear foot: $299 builder grade, $598 semi-custom, $1,196 custom. On the typical kitchen that’s $21,528.
  • Cabinet install. Also by the foot, and it climbs with the grade: $186.88 builder, $261.63 semi-custom, $411.13 custom. Typical kitchen: $9,419.
  • Appliances. Our typical kitchen carries $14,950 as an appliance allowance. The premium package on the high job is $35,357. The low job keeps the old appliances.
  • Countertops. Laminate runs $37.38 a sq ft in our book, quartz $104.65, quartzite $119.60. Installing quartz adds $67.28 a sq ft: $3,364 on the typical kitchen.
  • Tall pantry cabinets. The high kitchen has two, at $8,372 each, plus $2,466.75 each to install.
  • Flooring. LVP install labor on the typical kitchen: $838. Hardwood on the high kitchen: $3,289 in labor alone.

Line items people forget

  • Building permit allowance: $1,105. An allowance. Your jurisdiction sets the real fee.
  • Demo and haul-off: $1,084. Tearing out the old cabinets, counters and drywall and hauling it away, at $6.77 a sq ft of kitchen.
  • Tearing up the old floor: $360. Up and hauled away before the new floor goes down, at $2.25 a sq ft.
  • Venting the hood outside: $1,794. The rigid duct and the cap, installed. A vented hood is more than the hood.
  • Range circuit: $523. A dedicated 50-amp run for an electric range.
  • Fabricator template visit: $449. Stone counters get measured on site before they’re cut.
  • Extra hole in the counter: $142. For a soap dispenser, air gap or filtered tap.
  • Cleanup at the end: $0. Our book carries this line at $0 on purpose. The contractor adds their own.

If a bid you’re holding doesn’t mention these, ask whether they’re in there. A bid that leaves them out isn’t cheaper. It just shows up later.

Seattle, Tacoma, Spokane, Vancouver: same labor rate today, here’s why

Our price book sets labor rates by state right now, not by city. So labor on a kitchen remodel in Seattle prices the same in our book as in Tacoma, Spokane or Vancouver. Real crews in different towns do charge differently. We’d rather tell you that than make up a city number we don’t have. When the book prices by city, this page will say so.

Want to see how a bid gets itemized, line by line? See it work

Compare: Kitchen remodel cost in Oregon

How we know

Prices from InstaBid’s price book: 25,533 real prices across 11 trades, re-checked by 230+ automated estimates every day, regionally adjusted. Priced by John Dudley, 30-year general contractor. Every number on this page is the book’s cost for the job plus 30% for the contractor’s overhead and profit, run with no contractor’s private prices in it. InstaBid adds no markup of its own; the 30% stands in for what a contractor adds to his cost. Priced at a Seattle zip (98101) on engine version 71e09637. Prices as of November 17, 2026.

Contractors: this is our book. Bid it with yours.

Put your own prices and markup in and bid this job in under two minutes. 10-day free trial, one trade.
Start your 10-day free trial

Phone ringing and nobody answering? For $500, John will audit how your calls, forms and follow-ups get handled and give you the fixes in writing. Call John: (541) 442-2520.
Book the $500 audit

Homeowners: want a real number for your house?

The real number for your house comes from your contractor’s bid. Want to know what a good one looks like? See how InstaBid itemizes a job, line by line. No signup.
See it work

FAQ

Is this what I’ll pay?

Not exactly. $73,423 is our book’s cost for the typical job (160 sf kitchen, semi-custom, same layout: 20 lf base + 16 lf wall cabinets with soft-close, quartz counters 50 sf, subway backsplash 30 sf, mid appliance package, vented hood, disposal, tear out vinyl floor + new LVP 160 sf, 6 LED cans, 3 GFCI, drywall patching, walls + ceiling painted) plus 30% for the contractor’s overhead and profit. His real markup, your house and your finishes all move it. The number for your own house is his itemized bid, so ask him to itemize it.

Why is labor different in WA vs OR?

Our price book adjusts labor by state. On the same typical job, labor is $23,866 in Washington and $22,870 in Oregon, while materials are $49,557 and $47,637. Labor rates are set by state: every city in Washington gets the same labor rate today.

Why does a kitchen run from the low number to the high one?

Mostly cabinets and appliances. Our book prices cabinets at $299 a linear foot for builder grade and $1,196 for custom. On the high kitchen the cabinets come to $66,976 before install, and the appliance package is $35,357. That’s how the job goes from $26,468 to $202,330.

How often are prices updated?

We re-run every number on this page from our price book once a month, and again before any change to the page. Last run: November 17, 2026.


Priced by John Dudley, 30-year general contractor, founder of InstaBid and co-host of Around the House, heard on 200+ stations.

Stop losing jobs to paperwork.

Walk the job, talk it out, and you have a real itemized estimate in under two minutes. Ten days free, no card. Then $99 a month for one trade.

Start free →

Want to stay up to date with new happenings and what’s getting built here at InstaBid?

Sign up for the newsletter.

You walk the job. It writes the itemized bid. Built by a 30-year general contractor. Your prices, your markup, your name on it.

© 2026 InstaBid, by John Dudley of Around the House. Built for contractors who’d rather be on the job. Privacy · Terms of Use · Support

Sale Special · going on right now

Pay for 90 days. Get all this free.

One trade: $297 up front for 3 months · Crew $747 · Shop $1,497

Sign up free, then prepay inside the app.